|
WEQ Final Actions - To be applied to Version 004.1 when Published
WEQ 2023 Annual Plan Item 2.b -
Review the WEQ OASIS Business Practice Standards for needed modifications regarding Resales “off OASIS” - Ratified April 26, 2024
R23002 Final Action -
Request to modify WEQ-004 Coordinate Interchange 004-17, 004-17.2, and 004-17.3 to provide clarity regarding ramp durations - Ratified November 27, 2023
WEQ Final Actions - Published on July 31, 2023 and referenced in Version 004 of the WEQ Standards
WEQ Final Actions Version 004 Business Practice Standards
WEQ 2023 Annual Plan Item 5.d / R22001 - Develop business practices to define a common list of grid services for electric market interactions that support grid-edge resources such as distributed energy resources and batteries in support of U.S. Department of Energy Grid Modernization Laboratory Consortium efforts (Standards Request R22001) - Ratified April 27, 2023
WEQ 2023 Annual Plan Item 5.d / R22001 Attachment - Ratified April 27, 2023
WEQ 2022 Annual Plan Item 3.c / R21004 - Review the NAESB WEQ OASIS Business Practice Standards addressing consolidations and revise the standards as needed to support the TSP’s Tariff and FERC 18 CFR 37.6 OASIS posting regulations (Standards Request R21004) - Ratified November 18, 2022
WEQ 2022 Annual Plan Item 4.a - Review annually at a minimum WEQ-012 and the accreditation requirements for Authorized Certification Authorities to determine if any changes are needed to meet market conditions - Ratified November 18, 2022
WEQ 2022 Annual Plan Item 2.a - Consistent with FERC Order No. 676-J, review WEQ-023-1.4 and WEQ-023-1.4.1 and determine if revisions are needed to address NOPR comments regarding contract path management - Ratified November 18, 2022
WEQ 2022 Annual Plan Item 3.b.ii / R21003 - Review the need to easily assess profile changes that occurred as a result of Preemption-ROFR process and revise the standards as needed - Ratified November 18, 2022
WEQ R21005 - Review the Preemption-ROFR Process Table 25-3 Priorities for Competing Reservations or Requests to identify description changes necessary to account for competition between firm and non-firm requests or reservations - Ratified November 18, 2022
RMQ 2022 Annual Plan item 2.a / WEQ 2022 Annual Plan Item 5.b.i - Develop technical implementation business Practice standards to support automation of the current REC creation, accounting, and retirement processes for voluntary markets consistent with the Base Contract for Sale and Purchase of RECs - Ratified November 18, 2022
RMQ 2022 Annual Plan item 2.a / WEQ 2022 Annual Plan Item 5.b.i – Attachment A - Ratified November 18, 2022
WEQ 2022 Annual Plan Item 5.b.i – Attachment B - Ratified November 18, 2022
RMQ 2022 Annual Plan item 2.a / WEQ 2022 Annual Plan Item 5.b.i – Attachment C - Ratified November 18, 2022
RMQ 2022 Annual Plan item 2.a / WEQ 2022 Annual Plan Item 5.b.i – Attachment D - Ratified November 18, 2022
RMQ 2022 Annual Plan item 2.a / WEQ 2022 Annual Plan Item 5.b.i – Attachment E - Ratified November 18, 2022
RMQ 2022 Annual Plan item 2.a / WEQ 2022 Annual Plan Item 5.b.i – Attachment F - Ratified November 18, 2022
WEQ 2021 Annual Plan item 3.e.i / Standards Request R21003 – Review the Request Timing Tables 4-2, 25-4, and 105-A to identify timing extensions changes necessary to account for human performance and revise the standards as needed - Ratified April 28, 2022
WEQ 2022 Annual Plan Item 3.b.i / Standards Request R21003 – Review the current rollover rights functionality, that is automatically redirected when a redirect is submitted to end of term and revise the standards as needed - Ratified April 28, 2022
WEQ 2021 Annual Plan Item 3ai Final Action - Review WEQ-001, WEQ-002, WEQ-003, and WEQ-013 and make modifications as needed for consistency in the use of the defined terms, acronyms, and abbreviations - Ratified November 4, 2021
WEQ 2021 Annual Plan Item 3aiii Final Action - Review WEQ-005, WEQ-007, WEQ-008, and WEQ-023 and make modifications as needed for consistency in the use of defined terms, acronyms, and abbreviations - Ratified November 4, 2021
WEQ 2021 Annual Plan Item 3aiii Final Action Attachment 1 - Revisions to WEQ-008 - as Revised - Ratified November 4, 2021
WEQ 2021 Annual Plan Item 3aiii Final Action Attachment 2 - Revisions to WEQ-023 - as Revised - Ratified November 4, 2021
WEQ 2021 Annual Plan Item 3c Final Action - Develop of industry business practice standards, as applicable, for identification of all modifications of service made to an original reservation in one location within OASIS - Ratified November 4, 2021
2021 RMQ Annual Plan Item 2.a and 2021 WEQ Annual Plan Item 6.b.i Final Action – Develop a Base Contract for Sale and Purchase of Renewable Energy Certificates (RECs) to support the voluntary markets - Ratified November 4, 2021
2021 RMQ Annual Plan Item 2.a and 2021 WEQ Annual Plan Item 6.b.i Final Action – Attachment 1 – NAESB Base Contract for Sale and Purchase of Voluntary Renewable Energy Certificates - Ratified November 4, 2021
2021 RMQ Annual Plan Item 2.a and 2021 WEQ Annual Plan Item 6.b.i Final Action – Attachment 2 - NAESB REC Base Contract FAQ Document - Ratified November 4, 2021
2021 WEQ Annual Plan Item 1.a/Standards Request R20008 Final Action - Update WEQ-005 Area Control Error (ACE) Equation Special Cases to account for modifications to NERC Dynamic Transfer Reference Document V 4 - Ratified November 4, 2021.
2021 WEQ Annual Plan Item 1.a/Standards Request R20008 Final Action – Attachment – WEQ-005 as Revised - Ratified November 4, 2021.
R21002 Final Action - Review NAESB WEQ Business Practice Standards definition for System Operating Limit following NERC’s proposal to revise the definition for System Operating Limit in the NERC Glossary - Ratified November 4, 2021.
2021 WEQ Annual Plan Item 3.a.ii Final Action - Review WEQ-004 and WEQ-022 and make modifications as needed for consistency in the use of defined terms, acronyms, and abbreviations - Ratified November 4, 2021.
2021 WEQ Annual Plan Item 3.a.iv Final Action - Review WEQ-012 and make modifications as needed for consistency in the use of defined terms, acronyms, and abbreviations - Ratified November 4, 2021.
WEQ 2021 Annual Plan Item 2.a Final Action: Consistent with FERC Order No. 676-I, reconsider the reservation of WEQ-006 Manual Time Error Correction and determine if the standards should be retained or revised - Ratified April 19, 2021
R20011 Final Action: Request to review and update backup procedures for tagging entities as captured within WEQ-004 and the NAESB Electronic Tagging (e-Tag) Specification Version 1.8.4. - Ratified April 9, 2021
WEQ 2021 Annual Plan Item 3.a / R20013 Final Action: Modify WEQ-000 Abbreviations, Acronyms, and Definition of Terms Business Practice Standards to provide a cross reference column to indicate which NAESB WEQ Business Practice Standards the abbreviations, acronyms, and definition of terms applies to
(Standards Request R20013). - Ratified April 9, 2021
WEQ 2020 Annual Plan Item 3.a Final Action: Develop industry Business Practice Standards to define the eligibility and treatment of Rollover Rights. - Ratified November 30, 2020
WEQ 2020 Annual Plan Item 3.e Final Action: Development of industry Business Practice Standards for adding new variables on certain query responses (e.g., NITSLoadForecast, etc.). - Ratified November 30, 2020
WEQ 2020 Annual Plan Item 3.f Final Action: Evaluate and develop a common industry data specification to support automated Net Scheduled Interchange (NSI) Checkout. - Ratified November 30, 2020
R20003 Final Action: Review WEQ-001-9 and WEQ-001-10 Redirect Standards for Modifications Needed per Order 676-I. - Ratified November 30, 2020
R20010 Final Action: NAESB WEQ-001 Enhancement to Redirect Examples. - Ratified November 30, 2020
WEQ Final Actions - Published on March 30, 2020 and referenced in Version 003.3 of the WEQ Standards
WEQ Final Actions Version 003.3 Business Practice Standards
WEQ 2020 Annual Plan Item 2.a Final Action: Paragraphs 1627 of Order 890 - Posting of additional information on OASIS regarding firm transmission curtailments. - Ratified March 23, 2020
WEQ 2019 Annual Plan Items 6.a, 6.b.ii, 6.c.ii Final Action - Develop and/or modify the NAESB Business Practice Standards if needed to address any recommendations resulting from the surety assessment performed by Sandia National Laboratories. - Ratified March 20, 2020
WEQ 2019 Annual Plan Items 1.a and 1.b / R11020 Final Action - Parallel Flow Visualization/Mitigation for Reliability Coordinators in the Eastern Interconnection and Revise TLR level 5 to be treated similarly to TLR level 3 in terms of treating the next hour allocation separately from that of the current hour (R11020). - Ratified March 20, 2020
WEQ 2019 Annual Plan Item 3.c Final Action - Review the NAESB Network Integration Transmission Service (NITS) Business and Technical Standards for needed modifications based on implementation and operational experiences since their adoption. - Ratified March 20, 2020
WEQ 2019 annual Plan Item 3.h / R18011 Final Action - Request regarding the implementation of WEQ-004 Appendix D / Commercial Timing Tables for WECC. - Ratified November 25, 2019
R19008 Final Action - Review of NAESB WEQ Business Practice Standards Following NERC Standards Efficiency Review Retirements Affecting the INT Family of Reliability Standards. - Ratified November 15, 2019
R19007 Final Action - Review of NAESB WEQ Business Practice Standards Following NERC Standards Efficiency Review Retirements Affecting the MOD Family of Reliability Standards. - Ratified November 15, 2019
WEQ 2019 Annual Plan Item 3.g / R18010 Final Action - Request for modifications to the current Next Hour Market Service (NHM) business practice in WEQ-001-7. - Ratified April 29, 2019
WEQ 2019 Annual Plan Items 3.b and 3.f (formerly WEQ 2018 Annual Plan Items 3.c and 3.h) / R18009 Final Action - Evaluate adding dynamic notification for the rollover rights renewal deadline, develop new standards/modifications as needed, remove HTTP notification, and establish a generic structure for e-mail notification. - Ratified April 29, 2019
WEQ 2018 Annual Plan Item 3.e Final Action - Develop new OASIS Business Practice Standards to ensure that reservation capacity that is assigned to untagged Pseudo-Ties is preserved for that purpose. - Ratified November 15, 2018
WEQ 2018 Annual Plan Item 3.b Final Action - Evaluate the ability to define specific lists to be submitted for the Query/Response in the OASIS template format and develop new standards/modifications as needed - Ratified September 24, 2018
2018 WEQ Annual Plan Item 2.a.i.2 Final Action - Redispatch Cost Posting to allow for posting of third party offers of planning redispatch services. - Ratified May 25, 2018
WEQ Final Actions - Published on December 8, 2017 and referenced in Version 003.2 of the WEQ Standards
WEQ Final Actions Version 003.2 Business Practice Standards
WEQ 2017 Annual Plan Item 1.e.v Final Action - Review and modify as necessary WEQ-015, WEQ-018, and WEQ-020 to address Line Items 19 through 22 from SRS Assignment Document. - Ratified November 28, 2017
WEQ 2017 Annual Plan Item 1.e.iii Final Action - Review and modify as necessary WEQ-001, WEQ-002, WEQ-003, and WEQ-013 to address Line Items 2 through 17 from SRS Assignment Document. - Ratified November 28, 2017
WEQ 2017 Annual Plan Items 2.a.i.1/R05019 and 5.a/R09003 Final Action - Short-Term Firm Preemption and Competition (OATT Section 13.2 and 14.2), and add language to WEQ-001-4 Online Negotiation and Confirmation process to clarify Table 4-3. - Ratified November 28, 2017
WEQ 2017Annual Plan Item 1.d.i/R16008 Final Action - Modifications to WEQ-004 Coordinate Interchange Business Practice Standards for Dynamic Tags and Psuedo-Tie type e-Tags - Ratified September 15, 2017
WEQ 2017 Annual Plan Item 1.e.iv/R16010 Final Action - Assess Impact on NAESB Business Practice Standards and Specifications due to changes in tool ownership, NERC Committee Structure, and changes to the NERC Rules of Procedures.(R16010) Review and modify as necessary WEQ-008 to address Line Item 18 from SRS Assignment Document - Ratified September 15, 2017
WEQ 2017 Annual Plan Item 1.e.iv/R16010 Final Action - Attachment - Ratified September 15, 2017
WEQ 2016 Annual Plan Item 5.c Final Action: Review WEQ-022 and remove references to NERC (ERO) to reflect the full transition of the EIR. - Ratified March 24, 2017
WEQ 2016 Annual Plan Item 5.c Final Action - Attachmentnt - Ratified March 24, 2017
WEQ 2016 Annual Plan Item 1.d/R16002 Final Action: Develop, modify or delete business practices standards to support NERC activities related to NERC Time Error Correction (BAL-004-0). - Ratified March 24, 2017
WEQ 2016 Annual Plan Item 1.d/R16002 Final Action - Attachment - Ratified March 24, 2017
WEQ 2016 Annual Plan Item 5.b / R09015 Final Action: Create a new OASIS mechanism that allows for the merger of like reservations without the use of the resale mechanism (R09015). - Ratified November 25, 2016
WEQ 2016 Annual Plan Item 5.d Final Action: Review and modify as necessary WEQ-004, EIR Business Practice Standards, e-Tag Specification, and e-Tag Schema to make the necessary modifications to recognize the Market Operator Role within the Electric Industry Registry. - Ratified September 19, 2016
WEQ 2016 Annual Plan Item 5.d Final Action - Attachment 1: WEQ-004 as Revised - Ratified September 19, 2016
WEQ 2016 Annual Plan Item 5.d Final Action - Attachment 2: WEQ-022 as Revised - Ratified September 19, 2016
WEQ 2016 Annual Plan Item 5.d Final Action - Attachment 3: WEQ-002, WEQ-003, and wEQ-013 as Revised - Ratified September 19, 2016
WEQ Final Actions - Published on September 30, 2015 and referenced in Version 003.1 of the WEQ Standards
WEQ Final Actions Version 003.1 Business Practice Standards
R15005 Final Action - Modification of DUNS number treatment in OASIS. - Ratified September 25, 2015
WEQ 2015 Annual Plan Item 1.e / R14002 Final Action: Develop, modify, or delete business practice standards to support request R14002 (NERC Project 2012-05 ATC Revisions (MOD A)). - Ratified September 18, 2015
WEQ 2015 Annual Plan Item 3.a.i.1 Final Action: Eliminate Masking of TSR tag source and sink when requested status is denied, withdrawn refused, displaced, invalid, declined, annulled or retracted. - Ratified September 18, 2015
WEQ 2015 Annual Plan Item 5.a / R08011 Final Action: Consistent with �51 of FERC Order No. 890-A, add AFC and TFC values to the �System_Attribute� data element of the NAESB Standard WEQ-003: OASIS S&CP Data Dictionaries. - Ratified September 18, 2015
WEQ 2015 Annual Plan Item 5.b / R08027 Final Action: Correct WEQ 013-2.6.7.2. � Resale off OASIS. - Ratified September 18, 2015
WEQ 2015 Annual Plan Item 6.a Final Action: Develop standards to support the Transmission Provider right to reassess the availability of conditional firm. - Ratified September 18, 2015
R15004 Final Action: Modifications to WEQ-004 Coordinate Interchange Business Practice Standards. - Ratified September 18, 2015
2015 WEQ Annual Plan Item 7.d Final Action: Consider Bonneville Power Administration comment concerning the treatment of a conditional point-to-point reservation included in a coordinated group when displaced through preemption. - Ratified June 1, 2015
2015 WEQ Annual Plan Item 7.c Final Action: Revise NAESB standard WEQ-001-106.2.5 to clarify when Transmission Providers may refuse a request for terminating secondary network service based on the availability of capacity. - Ratified June 1, 2015
2015 WEQ Annual Plan Item 7.b Final Action: Modify NAESB standards WEQ-001-9.5, WEQ-001-10.5, and related standards to be consistent with the Commission�s policy in Dynegy Power Marketing, Inc. and Entergy Services, Inc. - Ratified June 1, 2015
2015 WEQ Annual Plan Item 7.a Final Action: Consistent with FERC Order Nos. 890 and 676-H, modify NAESB standards WEQ-001-14.1.3 and WEQ-001-15.1.2 to provide for a one-day requirement for posting Available Transfer Capability narratives. - Ratified June 1, 2015
Final Action WEQ 2014 Annual Plan Item 3.a.ii - Review and correct WEQ-004 Coordinate Interchange Business Practice Standard as needed based on activities in NERC Project 2008-12, Coordinate Interchange Standards Revisions and supporting EOP-002-2 R4 and R6 - Ratified September 24, 2014
Final Action WEQ 2014 Annual Plan Item 3.a.ii - Attachment - Ratified September 24, 2014
R14001 Final Action: Modifications to NAESB Business Practice Standards Abbreviations, Acronyms, and Definition of Terms to support NERC CISDT under Project 2008-12. - Ratified June 5, 2014
2013 WEQ Annual Plan Item 3.a.iii.1-2 Final Action: Develop standards to support interconnection scheduling in 15 minute intervals per FERC Order No. 764 - Ratified December 2, 2013
2013 WEQ Annual Plan Item 3.d Final Action: Develop Electric Industry Registry Business Practice Standards - Ratified September 23, 2013
R12010 Final Action: Requirements for scheduling interchange in 15 minute intervals - Ratified June 5, 2013
2012 WEQ Annual Plan Item 6.a Final Action: Develop standards to support PAP 10, Energy Usage Information Model, Phase 2, Harmonization with CIM and SEP 2.0 - Ratified March 21, 2013
2012 WEQ Annual Plan Item 4.b, Part 1 Final Action: PKI Standard Requirements for e-Tagging (Part 1) - Ratified December 28, 2012
2012 WEQ Annual Plan Item 4.a Final Action: PKI Business Practice Standards for OASIS - Ratified November 28, 2012
Retail 2012 Annual Plan Item 3(b) Final Action: - Demand Reduction Value and Energy Efficiency Definitions (WEQ Consideration for consistency in definitions to terms that are used both in the Retail and Wholesale Electric Quadrants) - Ratified October 24, 2012
2012 WEQ Annual Plan Item No. 4.c.i-ii/R11014/R11015 Final Action: - Develop modifications for WEQ-012 as needed to reflect current market conditions (Authorized Certification Authority Standard and Credentialing Practice (R11014). Technology Review and Upgrade for NAESB Public Key Infrastructure Standard WEQ-012 (R11015)). - Ratified October 4, 2012
WEQ Final Actions - Published on July 31, 2012 and referenced in Version 003 of the WEQ Standards
WEQ Final Actions Version 003 Business Practice Standards
2011 WEQ Annual Plan Items 2(a)(i)(1-8), 2(b) and 3(a)(i) Final Action: Network Service on OASIS (NITS). - Ratified June 11, 2012
2011 WEQ Annual Plan Items 2(a)(i)(1-8), 2(b) and 3(a)(i) Final Action: NITS Attachment (WEQ-000). - Ratified June 11, 2012
2011 WEQ Annual Plan Items 2(a)(i)(1-8), 2(b) and 3(a)(i) Final Action: NITS Attachment (WEQ-001). - Ratified June 11, 2012
2011 WEQ Annual Plan Items 2(a)(i)(1-8), 2(b) and 3(a)(i) Final Action: NITS Attachment (WEQ-002). - Ratified June 11, 2012
2011 WEQ Annual Plan Items 2(a)(i)(1-8), 2(b) and 3(a)(i) Final Action: NITS Attachment (WEQ-003). - Ratified June 11, 2012
2011 WEQ Annual Plan Items 2(a)(i)(1-8), 2(b) and 3(a)(i) Final Action: NITS Attachment (WEQ-013). - Ratified June 11, 2012
R11022 Final Action: Business Practice Standard 013-2.6.8.1 and 013-2.6.8.2 FULL and PART TRANSER. - Ratified June 11, 2012
C11004 Final Action: Clarify if WEQ-001-9.1 can support a modification of only the source or sink for a long-term firm reservation. - Ratified March 26, 2012
WEQ 2012 Annual Plan Item 1.d Final Action: Revised Bulk Electric System Definition. - Ratified March 26, 2012
WEQ 2012 Annual Plan Item 5.e Final Action: Support Crediting Redirect Requests with the Capacity of the Parent Reservation. - Ratified March 26, 2012
WEQ 2011 Annual Plan Item 5.a/R08001/R08002/R08003/R08005 Final Action: Make consistency changes to Version 2.2. - Ratified November 28, 2011 (Minor Correction MC12003 applied effective March 30, 2012)
WEQ 2011 Annual Plan Item 7.a Final Action: Review of standards 001-14.1.3 and 001-15.1.2 based on FERC Order No. 676-E . - Ratified November 28, 2011
2011 WEQ Annual Plan Items 2.a.iii.1 through 2.a.iii.3 Final Action: Service Across Multiple Transmission Systems (SAMTS). - Ratified August 11, 2011
2010 WEQ Annual Plan Item 4(d) Final Action: Business Practice Standards for Measurement and Verification of Energy Efficiency Products. - Ratified May 13, 2011
2010 WEQ Annual Plan Item 4(d) Final Action: Business Practice Standards for Measurement and Verification of Energy Efficiency Products. - Ratified May 13, 2011 (Minor Correction MC12020 applied effective July 16, 2012)
2010 WEQ Annual Plan Item 4(a) and 4(b) Final Action: Review and develop business practice standards to support DR and DSM-EE programs. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(a)(ii) Final Action: Phase Two Requirements Specification for Common Electricity Product and Pricing Definition � for NIST PAP03. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(a-c) Final Action: Master Data Elements List for Business Practice Standards associated with NIST PAP 03 and PAP 09. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(b)(ii) Final Action: Phase Two - Requirements Specifications for Common Schedule Communication Mechanism for Energy Transactions � for NIST PAP04. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 6(c)(ii) Final Action: Phase Two Requirements Specification for Wholesale Standard DR Signals � for NIST PAP09. - Ratified March 21, 2011
2010 WEQ Annual Plan Item 1(a)(i) Final Action: Interim Solution for Parallel Flow Visualization. - Ratified December 6, 2010
2010 WEQ Annual Plan Item 1(a)(i) Final Action: Interim Solution for Parallel Flow Visualization. - Ratified December 6, 2010 (Minor Correction MC12025 applied effective July 31, 2012)
2010 WEQ Annual Plan Item 6(d) Final Action: Business Practices and Information Models to Support Priority Action Plan 10 � Standardized Energy Usage Information. - Ratified November 29, 2010
2010 WEQ Annual Plan Item 6(a) Final Action: Requirements Specifications for Common Electricity Product and Pricing Definition � for NIST PAP03. - Ratified August 20, 2010
2010 WEQ Annual Plan Item 6(b) Final Action: Requirements Specifications for Common Scheduling Mechanism for Energy Transactions � for NIST PAP04. - Ratified August 20, 2010
2010 WEQ Annual Plan Item 6(c) Final Action: Requirements Specifications for Wholesale Standard DR Signals � for NIST PAP09. - Ratified August 20, 2010
WEQ 2009 AP Items 5.a.2 (R08004) and 5.i (R09011) Final Action: - Multiple Annual Plan Items Affecting WEQ-011 Gas/Electric Coordination. - Ratified July 15, 2010
Attachment: WEQ 2009 AP Items 5.a.2 (R08004) and 5.i (R09011) Final Action: - Multiple Annual Plan Items Affecting WEQ-011 Gas/Electric Coordination. - Ratified July 15, 2010
2009 WEQ Annual Plan Item 5.b Final Action: Modify NAESB definitions to address internal inconsistencies and inconsistencies with the NERC glossary. - Ratified March 24, 2010
2009 WEQ Annual Plan Item 1.a, 3.a.vii/R05020 Final Action: Modifications to WEQ-004 Coordinate Interchange. - Ratified December 14, 2009
2009 WEQ Annual Plan Item 1.a, 3.a.vii/R05020 Final Action: Modifications to WEQ-004 Coordinate Interchange - Attachment
2009 WEQ Annual Plan Item 2.a.ii.3 Final Action: Rollover Rights on Redirect on a Firm Basis - Ratified July 27, 2009
2009 WEQ Annual Plan Item 3(d) Final Action: Order 717, Standards of Conduct - Ratified June 15, 2009
2008 WEQ Annual Plan Item 5(a) Final Action: Review and develop business practice standards to support DR and DSM-EE programs. - Ratified March 16, 2009
WEQ Final Actions - Published on March 11, 2009 and referenced in Version 002.1 of the WEQ Standards
WEQ Final Actions Version 002.1 Business Practice Standards
2008 WEQ Annual Plan Items 6(m)/R07007 Final Action: (Update the Timing Table to Reflect the Categories (On-time, Late, After-the-fact, and Pre-late) used in the latest E-Tag Specification with respect to receipt of an Arranged Interchange (RFI)). - Ratified March 11, 2009
2008 WEQ Annual Plan Items 2.a.iv.3, 3.a.vii and 6l (Part 1) Final Action: Rollover Rights on Redirect on a Firm Basis (Part 1). - Ratified January 12, 2009
2008 WEQ Annual Plan Items 1.a.ii Final Action: Continuous Support of TLR Procedure in Alignment with NERC Efforts on Phase II and Phase III DRAFT. - Ratified January 12, 2009
2008 WEQ Annual Plan Items 2.b.iii.1-3 Final Action: Capacity Benefit Margin (CBM). - Ratified December 15, 2008
WEQ Final Actions - Published on September 30, 2008 and referenced in Version 002.0 of the WEQ Standards
WEQ Final Actions Version 002.0 Business Practice Standards
2008 WEQ Annual Plan Item 2.a.i.2/2008 WEQ Annual Plan Item 2.a.vii.1 Final Action: Conditional Firm Business Practice Standards associated with S&CP Requirements completed in 2008 AP 2(a)(i)(1) and Tagging for Conditional Service (Additional changes to Rollover templates). - Ratified September 25, 2008
2008 WEQ Annual Plan Item 6.a/R07019 Final Action: Review/revised WEQ-006 to remove/revise mandatory requirements for Interconnection Time Monitor. - Ratified September 22, 2008
2008 WEQ Annual Plan Item 2.b.ii.2 Final Action: Postbacks and Counterflows Business Practice Standards. - Ratified September 22, 2008
2008 WEQ Annual Plan Item 2.a.iv.4, 2.a.vi.4, and 2.b.ii.1 Final Action: Existing Transmission Commitments. - Ratified September 22, 2008
2008 WEQ Annual Plan Item 6.d Final Action: Modify WEQ-001 to reflect in the definition of certain ancillary services that such ancillary services may be provided by non-generation resources such as demand resources. - Ratified September 22, 2008
2008 WEQ Annual Plan Items 2.a.i.4, 2.b.v.4, and 2.b.v.5 - Load Forecast and Actual Load Business Practice Standards associated with S&CP changes. - Ratified July 23, 2008
2008 WEQ Annual Plan Item 2.b.vii Final Action: WEQ-001 changes for �ATC Information Link� on OASIS and TTC and ATC methodologies and values. - Ratified June 27, 2008
2008 WEQ Annual Plan Item 2.a.i.5, 2.a.i.6, 2.a.ii.1-3 Final Action: WEQ-001 changes for Rebid of Partial Service, Preconfirmation Priority, and Group 2: Metrics; Redispatch Cost Posting. - Ratified June 23, 2008 - Minor Correction Applied September 10, 2008
2008 WEQ Annual Plan Item 2.b.v.3 and 2008 WEQ Annual Plan Item 2.a.i.3 Final Action: "ATC/TTC Narratives" - Ratified May 16, 2008
2007 WEQ Annual Plan Item 5 and 2007 WGQ Annual Plan Item 8 Final Action: �Develop business practices as needed to support the e-Tariff program including submittal of tariffs and metadata". - Ratified April 4, 2008
2007 WEQ Annual Plan Item 5 and 2007 WGQ Annual Plan Item 8 Final Action - Attachment
2008 Annual Plan Item 2(i)7 Final Action - OASIS Exemptions Appendix C - Ratified March 13, 2008
2008 Annual Plan Item 2(i)7 Final Action - Attachment
2007 WEQ Annual Plan item 2(ii) Final Action: Group 1: Conditional Firm, Annotations For ATC; Load Forecast And Actual Load; Re-Bid Of Partial Service; And Preconfirmation Priority - Ratified February 29, 2008 - Minor Correction Applied to Attachments February 27, 2008
2007 WEQ Annual Plan item 2(ii) Final Action: Attachment 1-OASIS S&CPs (WEQ-002) - Minor Correction Applied February 27, 2008 and September 10, 2008
2007 WEQ Annual Plan item 2(ii) Final Action: Attachment 2-OASIS Data Dictionary (WEQ-003)
2007 WEQ Annual Plan item 2(ii) Final Action: Attachment 3-OASIS Implementation Guide (WEQ-013) - Minor Correction Applied February 27, 2008 and September 10, 2008
C07001 Final Action: Interpretation of WEQ-011-1.2 - Ratified December 19, 2007
2007 WEQ Annual Plan Item 2(c) Final Action: Order 890 modifications to WEQ-001 - Ratified December 19, 2007 - Minor Correction Applied to Attachment February 27, 2008
2007 WEQ Annual Plan Item 2(c) Final Action: Attachment - Minor Correction Applied February 27, 2008
WEQ Final Actions - Published on October 31, 2007 and referenced in Version 001 of the WEQ Standards
WEQ Final Actions Version 001 Business Practice Standards
R06025 Final Action - Modify Appendix D of WEQ 004 to add an explanation for the terms �required� and �correctable�, to add a sentence clarifying that tag data elements are not correctable and are not required, and to make the element of energy Product Type required as revised by the WEQ Executive Committee on August 14, 2007 - Ratified October 4, 2007
R05018 Final Action - Revise the e-Tag Specification to allow PSEs associated with a transmission segment in the tag optional approval rights - Ratified September 17, 2007
Final Action R06026/WEQ 2007 Annual Plan Item 1(b) - Revise WEQ-004 Coordinate Interchange Business Practice Standard requirement 2.2 and the table contained in Appendix A, part B, to exempt the WECC - Ratified September 17, 2007
Final Action R06026/WEQ 2007 Annual Plan Item 1(b) Attachment
R07002 Final Action - Division of OASIS Standards and Communication Protocols (S&CP, WEQ 002, WEQ 003) - Ratified September 17, 2007
R07002 Final Action Attachment 1 - Revisions to S&CPs
R07002 Final Action Attachment 2 - Revisions to Data Dictionary
R07002 Final Action Attachment 3 - implementation Guide
2007 WEQ Annual Plan Item 2 Final Action - Recommendation for Revision to Final Action R04006D to align the Resales Standards with Order 890 - Ratified July 23, 2007
2007 WEQ Annual Plan Item 3(a)(2) Final Action - Recommendation for 2007 WEQ Annual Plan Item 3(a)(2) - Implementation of S&CP changes to support Standards of Conduct business practices
- Ratified April 7, 2007
2007 WEQ Annual Plan Item 3 (a)(2) Final Action Attachment
R04006C1 Final Action - Recommendation R04006C1 - OASIS 1A Enhancements � Redirects (Release Mechanism)- Ratified April 7, 2007.
R05001 Final Action - Recommendation - Amend WEQ R03013 to Align Coordinate Interchange Transactions with Version 0 (Ratified June 22, 2006) - Minor Correction Applied March 20, 2007.
R05001 Final Action Attachment - Permanent Numbering Applied November 16, 2006 - Minor Correction Applied March 20, 2007
R03007 and WEQ 2006 Annual Plan Item (3)(iii) Final Action - WEQ Public Key Infrastructure (PKI) Standards - Ratified February 10, 2007.
2006 WEQ Annual Plan Item 3 (c)(i) Final Action - Ratified October 2, 2006.
R04006D Final Action - Develop OASIS Phase 1A business practices. - Ratified October 2, 2006.
R04036 Final Action - Amend definitions, terms and numbering of WEQ Order 2004 (affiliate) standards. - Ratified October 2, 2006.
R06002 Final Action - Recommendation - Modify NAESB pre-split Version 0 TLR business practices to remain consistent with NERC IRO-006-1 pre-split TLR reliability standards (inclusion of market flows). - Ratified September 1, 2006. - Minor Correction Applied 09/17/2007.
R06002 Final Action Attachment - Minor Correction Applied 09/17/2007.
R05001 Final Action - Recommendation - Amend WEQ R03013 to Align Coordinate Interchange Transactions with Version 0 - Ratified June 22, 2006.
R05001 Final Action Attachment - Permanent Numbering Applied November 16, 2006
R05007 Final Action - Recommendation - Review of NAESB WEQ "Version 0" Business Practice Standards and remove any references to ERCOT. - Ratified June 22, 2006.
R04013A Final Action - Recommendation for Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard - Ratified April 10, 2006.
R04013A Final Action Attachment- Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard
R04035/R05002 Final Action - Revisions to OASIS for Redirects - Ratified January 5, 2006.
R04035/R05002 Final Action Attachment 1 - Appendix B
R04035/R05002 Final Action Attachment 2
R05009 Final Action - Modifications to Transmission Loading Relief (TLR) for Dynamic Schedules - Ratified October 10, 2005.
R04021 Final Action (Corrected with Permanent Numbers Applied) - Gas/Electric Coordination - Ratified July 8, 2005.
WEQ Final Actions - Published on January 18, 2005 and referenced in Version 0 of the WEQ Standards
WEQ Final Actions Version 0 Business Practice Standards
R04013 Final Action -Version 0 Business Practices Standards - Ratified December 31, 2004.
R04013 Final Action - Attachment 1 - Coordinate interchange - Ratified December 31, 2004.
R04013 Final Action - Attachment 2 - ACE Special Cases - Ratified December 31, 2004.
R04013 Final Action - Attachment 3 - Manual Time Error Correction - Ratified December 31, 2004.
R04013 Final Action - Attachment 4 - Inadvertent Interchange - Ratified December 31, 2004.
R04013 Final Action - Attachment 5 - Transmission Loading Relief (Eastern Interconnection) - Ratified December 31, 2004.
WEQ Final Actions OASIS
R04005A Final Action - OASIS Baseline Cleanup - Ratified December 30, 2004.
R04006A Final Action - OASIS 1A Enhancements - Standards of Conduct - Ratified December 30, 2004.
R04006B Final Action - OASIS 1A Enhancements - Multiple Requests - Ratified December 30, 2004.
R04006C Final Action - OASIS 1A Enhancements - Redirects - Ratified December 30, 2004.
R04011 Final Action - OASIS Requirements for FERC Order No. 2003 - Generation Interconnection - Ratified December 30, 2004.
FTAA Final Action - Ratified July 21, 2004.
R03013 Final Action - Ratified June 21, 2004.
R03013 Final Action Attachment 1 - Data Sheet
R03013 Final Action Attachment 2 - Timetable
R03013 Final Action Attachment 3 - Flow Diagram
R04005 Final Action - Ratified April 7, 2004.
R04005 Final Action Attachment 1
|