Click Here To Return to the WEQ Home Page

Wholesale Electric

Retail ElectricWholesale GasRetail Gas
 


Search | What's Hot? | Press Release | Home  
 
WEQ Business Practices Subcommittee
 
WEQ Business Practices Subcommittee:


 WEQ BPS Mission and Scope Statement

 Procedures for BPS Interactive List Serv (Exploder)

 WEQ Business Practices Subcommittee Version 0 Drafts - Documents and Links

 Post-split TLR Business Practice Standards (R04013A) Update Report, Chart and Accompanying Documents

 Link to Joint WEQ BPS/ESS/ITS Meetings on ATC/AFC

Link to Time and Inadvertent Management Task Force

  
Please note that we have started posting all files in editable format. If you experience problems accessing the formatted document, please call the NAESB office (713-356-0060) and it will be provided to you in Adobe Acrobat (pdf) format.
Date Event/Location Agenda Minutes Misc.
April 1, 2010

Please note new location
WEQ BPS

Houston, TX

Held at the NAESB office

with Web Conferencing
9:00am - 4:00pm (Central)    
March 17-18, 2010

Please note date change
WEQ BPS

Norristown, PA

Hosted by PJM

with Web Conferencing provided by PJM
Agenda   Directions to PJM Service Center

Nearby Hotels

Audio and Web Cast details as provided by PJM

Determining Whether a Generator is Using F or NF Transmission Service - Submitted by A. Pritchard, Duke Energy
February 23-24, 2010

Please note date change
WEQ BPS

Houston, TX

Held at the NAESB office

with Web Conferencing
Agenda with Corrected Audio and Web Cast Details

Agenda Items Completed
on February 23

Meeting CANCELLED
for February 24
Draft Minutes

BPS Review NERC Project 2007-02
Joint WEQ/WGQ Meeting Minutes Approved by WGQ BPS

December 15, 2009 Minutes

December 18, 2009 Minutes

WEQ SRS Request

WEQ SRS Write-up NERC Project 2007-02

FERC Notice of Inquiry

Order Denying NRG-EPSA-Constellation Rehearing

NOI TLR Reliability Standards and Curtailment Priorities

Parallel Flow Visualization

Assignments

Concepts

Motions

Scenarios (January 20, 2010)

PFV White Paper
January 20, 2010 WEQ BPS

Houston, TX

Held at the NAESB office

with Web Conferencing
Agenda Final Minutes Parallel Flow Visualization Motions

Common Generator Prioritization Method

Flowgate Allocation Prioritization Method

Parallel Flow Visualization Concepts

Parallel Flow Visualization Assignments
December 18, 2009 Joint WGQ and WEQ BPS

Conference Call

With Web Conferencing
Agenda Final Minutes

Attachments:
Additional Final WGQ Proposed Modifications as of 12/18/09


Final WGQ Proposed Standard Modifications as of 09/28/09

WEQ/WGQ BPS Formal Comments on WEQ 2009 AP Items 5.a.2 (R08004) and 5.i (R09011)
Proposed PPGC and PPGC Facility Definitions from A. Johnson

Suggested Edits Submitted by The United Illuminating Company - 12/17/2009

Draft Comments for WEQ-011
December 15, 2009 Joint WGQ and WEQ BPS

Conference Call

With Web Conferencing
Agenda Final Minutes

Transportation Service Provider Definition
Suggested Changes to the 9/14/09 Joint WEQ/WGQ BPS Draft Minutes Submitted by D. Davis, Williams Gas Pipeline (Redline)

Suggested Changes to the 9/28/09 Joint WEQ/WGQ BPS Draft Minutes Submitted by D. Davis, Williams Gas Pipeline (Redline)

WEQ-011 Recommendation

WEQ-011 Redline Changes

WEQ-011 Comments from Consumers
December 14, 2009 WEQ BPS Conference Call

With Web Conferencing
CANCELLED    
December 8, 2009 WEQ BPS

Houston, TX

Held at the NAESB office

with Web Conferencing
Agenda Final Minutes

Motions Document
Nearby Hotels

Parallel Flow Visualization

Concepts Document

Common Generator Prioritization Method

Flowgate Allocation Prioritization Method

Presentation from B. Erhardt/S. Sanders

Parallel Flow Visualization Submitted by J. Busbin, Southern Company

CO-283 Gen to Load Reporting Requirements - Rev3 0 Submitted by J. Busbin, Southern Company

Generation to Load Project Timeline Submitted by J. Busbin, Southern Company

Order 676-E

BPS Highlights

ATC Standards Not Approved
November 16, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

Consumers Energy Comments
Parallel Flow Visualization Concepts

Common Generator Prioritization Method

Flowgate Allocation Prioritization Method

Parallel Flow Visualization Presentation

WEQ-011 Recommendation

Recommendation

WEQ-011 (Redline)

WEQ SRS Comments

Consumers Comments
October 21, 2009 WEQ BPS

Houston, TX

Held at the NAESB office

with Web Conferencing
Agenda Final Minutes

Parallel Flow Visualization Concepts

WEQ/WGQ Joint 9/14/09 Draft Minutes as approved by the WEQ BPS on 10/21/09

WEQ/WGQ Joint 9/28/09 Draft Minutes as approved by the WEQ BPS on 10/21/09
Nearby Hotels

Parallel Flow Visualization Assignments

Parallel Flow Visualization Presentation
October 19, 2009 WEQ BPS Conference Call

With Web Conferencing
CANCELLED    
September 28, 2009 Joint WGQ and WEQ BPS

Conference Call

With Web Conferencing
Agenda Final Minutes

Attachments:
Final WGQ Proposed Standard Modifications as of 09/28/09


WEQ/WGQ Joint 9/14/09 Draft Minutes as approved by the WEQ BPS on 10/21/09
WEQ Business Practice Standards (Redlines)

WGQ Business Practice Standards (Redlines)

WEQ Draft Recommendation

Blank Recommendation Form
September 14, 2009 Joint WGQ and WEQ BPS

Conference Call

With Web Conferencing
Agenda Final Minutes

WEQ/WGQ Joint 9/14/09 Draft Minutes as approved by the WEQ BPS on 10/21/09
Annual Plan Items Background Information

Standards Request R08004

NERC-NAESB Definitions Cross Reference

WEQ Draft Glossary Recommendation

Standards Request R09011

Draft Recommendation

Draft Recommendation WEQ-011
August 25, 2009 Request for Informal Comments Due September 25, 2009     Request for Comments Due September 25, 2009

Draft Glossary Recommendation - WEQ 2009 Annual Plan Item 5.b

Comments Submitted by F. Halpin, BPA

Comments Submitted by the WEQ BPS Co-Chairs

Comments Submitted by S. Stoney, South Carolina Electric and Gas Company

Comments Submitted by E. Davis, Entergy

Comments Submitted by B. Rehman, BPA

Comments Submitted by JT Wood, Southern Company

Comments Submitted by various ISO/RTOs
August 25, 2009 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Carmel, IN

Hosted by Midwest ISO

Audio and Web Conferencing Provided by the Midwest ISO
Agenda Draft Minutes Carmel Hotel Map - Meeting being held at the Hampton Inn and Suites located at 12197 North Meridian

Audio and Web Cast details as provided by the Midwest ISO
August 12, 2009 WEQ BPS

Carmel, IN

Hosted by Midwest ISO

With Audio and Web Conferencing Provided by Midwest ISO
Agenda Final Minutes

WEQ BPS Proposed Changes to the WEQ 2009 Annual Plan

Agenda - as revised during the meeting

Market Flow Threshold - Minor Correction
Logistics

Nearby Hotels

Hotel Amenities

Map/Directions

Audio and Web Cast Details as Provided by MISO

WEQ AP Item 1.b.ii

WEQ-008 Appendix D Redline

WEQ AP Item 1.b.i

Parallel Flow Visualization Assignments

Parallel Flow Input Submitted by C. Wesley, PJM

TLR - Parallel Flow Visualization - TVA Observations Submitted by K. York

Parallel Flow Input - Submitted by Charles Yeung, SPP

Work Paper Submitted by J. Busbin, Southern Company
August 10, 2009 WEQ BPS Conference Call

With Web Conferencing
CANCELLED    
July 23, 2009 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

Conferencing Provided by NERC
Agenda Final Minutes Additional Meeting Materials

Market Flow Threshold Field Test Recommendations - 7/22/09
July 22-23, 2009 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Minneapolis, MN

Hosted by OATI

With Audio and Web Conferencing Provided by NERC
CANCELLED    
July 13, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes Meeting Minutes

Suggested Changes to the 3/12/09 Draft Minutes Submitted by D. Davis, Williams Gas Pipeline and approved by WGQ BPS on 7/2/09 (Redline)

Suggested Changes to the 4/21/09 Draft Minutes Submitted by D. Davis, Williams Gas Pipeline and approved by WGQ BPS on 7/2/09 (Redline)

WEQ-011 Gas Electric Coordination

Revised Recommendation

Standards Request R09011 (Power Plant Gas Coordinator)

WEQ Annual Plan Item 1.b.i

Parallel Flow Visualization Assignments

WEQ Annual Plan Item 1.b.ii

WEQ 2009 AP Item 1.b.ii - WEQ-008 - Appendix D (draft redline)
June 16, 2009 WEQ BPS

Houston, TX

Held at the NAESB office

with Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

WEQ-011 - Proposed Revisions - Revised 6/16/09

Parallel Flow Visualization Assignments
Nearby Hotels

Consistency Changes R08004

Original Recommendation

WEQ-011 Proposed Revisions

Parallel Flow Visualization

NERC OC Presentation 6/9/09

WEQ 2009 Provisional Item 4 Supporting Documentation

Market Flow Threshold

WEQ-008 Appendix D

FERC Order 676-D

IRO-006-1

IRO-006-4

Request for Rehearing

FERC Order 713-A

TLR Request for Rehearing

TLR Request for Rehearing Granted
May 26, 2009 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

Audio and Web Cast to be provided by NERC
Agenda Final Minutes Item 3A-1 - IRO-006-EAST-1 MAY 22, 2009

Item 3A-2 - IRO-006-5 - May 22, 2009

Item 3A - C of C Project 2006-08 - TLRDT - May 22, 2009
May 18, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

SRS comments for WEQ-011 Consistency Recommendation Revised
WEQ-011 Consistency Changes Recommendation

Comments Submitted by SRS on WEQ-011 Consistency Changes Recommendation

Comments Submitted by MISO on WEQ-011 Consistency Changes Recommendation

April 13, 2009 Draft Meeting Minutes (E. Skiba comments)
April 28-29, 2009 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Carmel, IN

Hosted by Midwest ISO

With Web Conferencing Provided by Midwest ISO
Agenda - with Correct Time and Meeting Room Location

Agenda Items Completed
on April 28

Meeting CANCELLED
for April 29
Final Minutes  
April 21, 2009 Joint WGQ and WEQ BPS

Conference Call

With Web Conferencing
Agenda Final Minutes  
April 13, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes Draft Recommendation R08004 (Agenda Item 7)

WEQ BPS Mission and Scope Redlines (Agenda Item 8)

Draft Minutes 03/09/2009 - Redline Comments submitted by E. Skiba, Midwest ISO

Draft Minutes 03/23/2009 - Redline Comments submitted by E. Skiba, Midwest ISO
March 23, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

Order 717 Motions

Order 717 Draft Recommendation
Order 717 Motions

Order 717 Draft Recommendation - Revised per 3/9/09 Meeting
March 12, 2009 Joint WGQ and WEQ BPS

Conference Call
Agenda Final Minutes Suggested Changes to the January 30, 2009 WEQ/WGQ BPS Draft Minutes Submitted by D. Davis, Williams Gas Pipeline
March 9, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

Order 717 Motions
Order 717 Draft Recommendation

Comments Submitted by E. Skiba, Midwest ISO

Comments Submitted by B. Green, EPSA

Comments Submitted by JT Wood, Southern Company

Comments Submitted by B. Rehman, BPA

Standards of Conduct Comparison of New and Old Regulatory Text

WEQ BPS Mission and Scope Document
February 20, 2009 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

Audio and Web Cast to be provided by NERC
Agenda Draft Minutes  
February 9, 2009 Request for Comments Due March 3, 2009     Request for Comments Due March 3, 2009

Order 717 Draft Recommendation

Comments Submitted by E. Skiba, Midwest ISO

Comments Submitted by B. Green, EPSA

Comments Submitted by JT Wood, Southern Company

Comments Submitted by B. Rehman, BPA
February 9, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting
Gas Electric Coordination

R08020

Gas/Electric Standards

Power Plant Operator

Draft Recommendation R08004

TLR Coordination

Voltage and Reactive Control

NERC Status Voltage Reactive Control

Order 717

FERC Order 717

Order 717 Request for Waiver

Order 717 Draft Recommendation

Mission/Scope

WEQ BPS Mission/Scope Final Draft
January 30, 2009 Joint WGQ and WEQ BPS

Conference Call
Agenda Final Minutes Request R08020

Power Plan Operator-Generator Operator

R08020 Chairs Workpaper
January 28-29, 2009 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Houston, TX

Held at the NAESB office

With Web Conferencing
Agenda

Note: Day 2 Cancelled Due to Completion of Agenda Items on January 28, 2009
Draft Minutes Nearby Hotels

Meeting Materials
January 12, 2009 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Draft Recommendation R08004 - Revised 01/12/09 (Redline)

Draft Recommendation R08004 - Revised 01/12/09 (Clean)

WEQ BPS Mission-Scope Draft - Revised 01/12/09 (Redline)

WEQ BPS Mission-Scope Draft - Revised 01/12/09 (Clean)

Draft Recommendation R08004

Standards Request R08020

Draft 2009 Annual Plan

WEQ BPS Mission-Scope Draft

e-Tag Confidentiality Agreement
December 10-11, 2008 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Held in Toronto, Canada

Audio and Web Cast to be provided by NERC
Agenda

NOTE: DAY 2 CANCELLED (Dec 11, 2008) - Due to completion of agenda items on Dec. 10, 2008
   
December 1, 2008 Joint NAESB WEQ BPS, WEQ TIMTF and NERC BACSDT

Conference Call

With Web Conferencing
Agenda   WEQ 2008 Annual Plan Item 6b/R07020 Recommendation Redlne

WEQ AP Item 6.b (R07020) Formal Comments Review

Email from A. Rodriquez

r07020 - TVA Comments

r07020 - TVA Supplemental Comments
November 17, 2008 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as revised during the meeting

WEQ AP Item 6.b (R07020) Formal Comments Review

Proposed 2009 BPS Meeting Dates
WEQ EC Update

BPS Update to EC

TLR Coordination

IRO-006-5

IRO-006-EI-1

Time and Inadvertent Management

Redline Recommendation

M. Desselle/K. York

NERC

TVA

TVA Supplemental

Entergy 1

Entergy 2

BPA

ISO New England

Great River

JDRJC Associates

Otter Tail

Basin Electric

MidAmerican

Standards Review Subcommittee

Email from A. Rodriquez

Additional AP Items

R08004

R08020

2009 Annual Plan

BPS Co-Chairs Input
September 29-30, 2008 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Held in Orlando, FL

Audio and Web Cast to be provided by NERC
Agenda   Additional Meeting Materials
September 22, 2008 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

R06010 - WEQ 2008 AP Item 6.1 - Modify the timeing chart for Western Interconnection in WEQ-006 to an initiation of manual time error at + or - 5 (clean)

R06010 - WEQ 2008 AP Item 6.1 - Modify the timeing chart for Western Interconnection in WEQ-006 to an initiation of manual time error at + or - 5 (redline)

WEQ 2008 AP Item 1.a.ii - Continuous Support of TLR Procedure in Alignment with NERC Efforts on Phase II and Phase III (clean)

WEQ 2008 AP Item 1.a.ii - Continuous Support of TLR Procedure in Alignment with NERC Efforts on Phase II and Phase III (redline)

WEQ Inadvertent Interchange Payback Standards - WEQ 007 (redline)
TLR

Recommendation for 2008 Annual Plan – Item 1a(ii)

R07020

R07020 Recommendation (Revised 8/21/08)

Comments Submitted by L. Horn, Wisconsin Electric

Revised Comments Submitted by E. Davis, Entergy

Comments Submitted by D. Folk, FirstEnergy Corp.

Comments Submitted by W. Franklin, Entergy Services

Comments Submitted by L. Larson, Otter Tail Power Company

Comments Submitted by L. Akens, TVA

Comments Submitted by A. Rodriquez, NERC Staff

Comments Submitted by D. Hils, Duke Energy

NAESB Time and Inadvertent Management Business Practices FAQ - 8/16/-8

Response to NERC Comments

WEQ-007 - 9/19/08

Response to Otter Tail Comments

Response to FirstEnergy Comments

Response to Wisconsin Electric Comments

Response to Entergy Comments

Response to TVA Comments

Response to Entergy Services Comments

R07020 Recommendation

Time and Inadvertent Management Business Practices Implementation Plan - 9/19/08

WEQ BPS MTE WEQ-006 (Includes R07019) - 9/19/08

R06010

Draft Recommendation R06010

R08020

Request R08020
August 26, 2008 Request for Comments Due September 17, 2008     Request for Comments Due September 17, 2008

R07020 Recommendation (Revised 8/21/08)

Comments Submitted by L. Horn, Wisconsin Electric

Revised Comments Submitted by E. Davis, Entergy

Comments Submitted by D. Folk, FirstEnergy Corp.

Comments Submitted by W. Franklin, Entergy Services

Comments Submitted by L. Larson, Otter Tail Power Company

Comments Submitted by L. Akens, TVA

Comments Submitted by A. Rodriquez, NERC Staff

Comments Submitted by D. Hils, Duke Energy
July 31, 2008 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

Audio and Web Cast to be provided by NERC
Agenda    
July 29, 2008 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as Revised during the meeting

2008 AP Item 6 e iii (WEQ-011) Revised 7/29/08

2008 AP Item 6 e iii (WEQ-006) Revised 7/29/08

2008 AP Item 6 e iii (WEQ-007) Revised 7/29/08
R07019 Comments

Comments Submitted by J. Busbin, Southern Company Transmission

TLR Draft Recommendation

Recommendation TLR Support WEQ-008

Proposed WEQ-008 890 Related Changes

Definition of Terms (Draft Recommendation)

2008 AP Item 6 e iii (WEQ-007)

2008 AP Item 6 e iii (WEQ-011)

2008 AP Item 6 e iii (WEQ-005)

2008 AP Item 6 e iii (WEQ-006)

Other Business

Revised Draft Minutes from 4/25/08 Meeting Submitted by E. Skiba, Midwest ISO

Initial draft language (WEQ-007) from Time and Inadvertent Management Task Force

Initial draft language (WEQ-006) from Time and Inadvertent Management Task Force

Revised Draft Minutes from 6/4/08 Meeting Submitted by E. Skiba, Midwest ISO
June 26-27, 2008 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Minneapolis, MN

Held at the OATI Offices
Agenda

Agenda Items Completed
on June 26

Meeting CANCELLED
for June 27
Draft Minutes Item 1d - TLRDT Draft Meeting Notes 04/1-2/2008

Item 2 - Market Flow Threshold Field Test Report 6/1/08

Item 3 - Consider Comments TLR Manual 4/16/08

Item 3 - NERC-NAESB Operator's Reference Manual 4/24/08 reformat AJR REDLINE

Item 3 - NERC-NAESB Operator's Reference Manual 1/29/08 reformat AJR REDLINE

Item 4 - IRO-006-5

Item 4 - IRO-006-EI-1
June 4, 2008 WEQ BPS

Houston, TX

Held at the NAESB office

with Web Conferencing
Agenda Final Minutes

Agenda - as Revised during the meeting

Revised Recommendation R07019

General Information

Nearby Hotels with 2008 Rates

TLR Materials

Future Direction TLR-White Paper

Future Path for TLR Proposal 6/4/08 Final - Revised

Time and Inadvertent Management

Standards Request R07020

NERC Minutes Extract - Time and Inadvertent Mgmt

Time and Inadvertent Management Business Practice

Manual Time Error Correction

Standards Request R07019

BAL-004-1 (Pending Filing)

WEQ-006 (Current Business Practice)

Recommendation R07019 (draft)

NERC/NAESB Definition Comparison

NERC NAESB Definition Comparison April 30, 2008
April 25, 2008 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Agenda - as Revised during the meeting
Standards Request R05020

BAL-004-1(pending regulatory filing)

Future Direction TLR White Paper

Standards Request R07020

Standards Request R07019
April 1-2, 2008 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Carmel, IN
Agenda Draft Minutes  
January 29-30, 2008 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Houston, TX

Held at the NAESB office

with Audio and Web Conferencing provided by NERC
Agenda

Agenda Items Completed
on January 29

Meeting CANCELLED
for January 30
Draft Minutes Nearby Hotels with 2008 Rates
November 27-28, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Washington, DC

NERC offices

Audio and Web Conferencing provided by NERC
Agenda Final Minutes

List of Phase III Changes

IRO-006-5 revised 11-28-07
Transmission Loading Relief Procedure for the Eastern Interconnection: IRO-006-5

Memorandum on WEQ Annual Plan Committee: To Determine Future Path for TLR in Concert with NERC

Market Flow Threshold Field Test

TLR Flowchart Diagram
October 15, 2007 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

R06002 Final Action Attachment - Minor Correction Applied 9-17-2007 (Revised 10/15/2007)
Minor Corrections Needed for NAESB WEQ TLR BP - Request R06002

R06002 Final Action Attachment - Minor Correction Applied 9-17-2007
October 4-5, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Minneapolis, MN

Hosted by OATI

Audio and Web Conferencing Provided by NERC
Agenda Draft Minutes Market Flow Threshold Field Test 09/14/07

Draft NERC-NAESB Operator's Reference Manual - 10/01/2007

IRO-006-5 ELO Comments

TLR Summary

2006 - 2008 TLRSDT Inputs

Violation Severity Levels Development Guidelines Criteria 09/20/2007 TLRSDT Comment
September 13, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

With Web Conferencing

Audio and Web Conferencing Provided by NERC
CANCELLED    
September 6, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

With Web Conferencing

Audio and Web Conferencing Provided by NERC
Agenda Minutes not made available by NERC Meeting Announcement

Consideration of Comments on Initial Ballot of IRO-006-4 — Reliability Coordination – Transmission Loading Relief - Revised
August 22-23, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

New Location: Carmel, IN

Hosted by MISO

Audio and Web Conferencing provided by NERC
Agenda Draft Minutes

IRO-006-5 - End of Meeting
July 9-10, 2007 Joint NAESB WEQ BPS and NERC TLR Draft Minutes

NERC/NAESB Joint Operator's TLR Reference Manual

IRO-006-5 - Redline

IRO-006-5 - Clean

IRO-006-5 - Attachment 1 - Alternate Language - Redline

Compliance Auditor's Guide - 7/16/07
August 9, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

With Web Conferencing

Audio and Web Conferencing Provided by NERC
2:30pm - 4:00pm

(Eastern)

Single topic Meeting - no agenda to be provided by NERC
Minutes not made available by NERC  
July 20, 2007 WEQ BPS Conference Call

With Web Conferencing
Agenda Revised Final Minutes

TLR Business Standards - Redline 7/20/07
IRO-006-4 Final

IRO-006-4-Attachment 1 Final

Final Action R06002

Final Action R06002 - Attachment

Minor Correction List Submitted by K. York, TVA
July 19, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

With Web Conferencing

Audio and Web Conferencing Provided by NERC
8:00am - 9:00pm

(Central)

No Agenda provided by NERC
Minutes not made available by NERC Compliance Auditors Guide - 7/16/07

Joint Operator's Reference Manual
July 11-12, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Toronto, Canada

Audio and Web Conferencing Provided by NERC
Rescheduled to July 9-10    
July 9-10, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Toronto, Canada

Audio and Web Conferencing Provided by NERC
Agenda Draft Minutes List of Phase III Changes

June 19-20, 2007 Draft Minutes

May 23-24, 2007 Meeting Minutes

List of Phase III Changes

N.Muller's Response to A.Rodriquez's email on Phase III Changes

Email from A.Rodriquez to B.Li and N.Muller on IDC Reference Document

Draft Compliance Audit Guideline

IRO-006-5-V02

IRO-006-5 Attachment 1-V01

IRO-006-5 Revised Attachment 1 - Redlined 6/15/07

NERC/NAESB Operator's Reference Manual
June 20-21, 2007

Please note new meeting dates
Joint NAESB WEQ BPS and NERC TLR Drafting Team

Houston, TX

Held at the NAESB offices

With Web Conferencing
2nd Rescheduling - back to June 19-20    
June 19-20, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Location and host of meeting TBD
Rescheduled to June 20-21    
June 19-20, 2007

Please note this is the 2nd date change for this meeting
Joint NAESB WEQ BPS and NERC TLR Drafting Team

Houston, TX

Held at the NAESB offices

With Web Conferencing
Agenda Draft Minutes

Attachment - IRO-006-4 Final

Attachment - Comment Report - IRO-006-4-a

Attachment - IRO-006-4-Attachment 1 Final
Current Comments and Draft Responses
May 23-24, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Chattanooga, TN

Hosted by TVA

Web Conferencing provided by TVA
Agenda Draft Minutes Hotel Information
May 1, 2007 WEQ BPS

Conference Call

with Web Conferencing
Agenda Final Minutes

Minor corrections for TLR - 5/1/07

TLR redlined showing minor corrections only
TLR BP for NAESB
Revised March 28, 2007
April 26, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Conference Call

with Webex provided by NERC
Agenda Minutes not made available by NERC Draft Files for Review

IR0-006-4- White Paper 4/20/07

IR0-006-4- Questions 4/20/07

NERC TLR Implementation Plan 4/25/07

Comments by Mangum-Goins

Email Summary from Ben Li

Language for NAESB waiver to NERC for TLR comment period
April 18-19, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Carmel, IN

Hosted by MISO

Web Conferencing provided by MISO
Agenda Draft Minutes

April 18-19, 2007 TLR Meeting Agenda

Items to be posted

TLR Whitepaper 4/18/07 KY AR

Mapping of IRO-006 NERC/NAESB Split Attachment 1
- 4/17-18/2007


Draft TLR Comment Questions 4/18-19/2007

Draft IRO-006-3
- 4/17-18/2007 Clean
Nearby Hotels

Directions - Caremel, IN

Directions for the Lakeside Conference Center

Work Papers
March 27-28, 2007

Please note new dates
Joint NAESB WEQ BPS and NERC TLR Drafting Team

Houston, TX

NAESB Office, 13th Floor, San Jacinto Room

With Web Conferencing
Agenda Redlined Draft Minutes

TLR joint group Action Plan 3/30/07

Revised Agenda with Timeline included for NERC posting

Revised IRO-006 Attachment 1 3/27/07

Revised R06002 - 3/28/07

Revised IRO-006 3/30/07
Nearby Hotels

R06002 NAESB TLR with level 5A change

IRO-006 Attachment 1 General Update NERC/NAESB split revised 2/27-28/2007

IRO-006-3 as revised during 2/27-28/2007 meeting

NERC IDC Reference Document /Attachment 2 Revised 2/28/07

IRO-006 General Update NERC Sar attachment 2/28/07 - Clean

IRO-006 General Update NERC Sar attachment 2/28/07 - Redline

Draft TLR Comment Questions

IRO from FERC Filing Volumes I-III Reliability Standards Development Plan

Excerpt from Order 693 Re: TLR
March 19, 2007 WEQ BPS

Conference Call

with Web Conferencing
Agenda Final Minutes

TLR with level 5A change included
IRO-006-3 (version of IRO006-3 the committee plans to use in the mapping process)

R04013A Final Action - Recommendation for Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard - Ratified April 10, 2006

R04013A Final Action - Attachment

R06002 Final Action - Recommendation - Modify NAESB per split "Version 0" TLR Business Practices to remain consistent with NERC IRO-006-1 pre split TLR Reliability Standards (inclusion of market flows) - Ratified Septemer 1, 2006

R06002 Final Action - Attachment

IRO-006 Attachment 1 General Update NERC/NAESB split revised 2/27-28/2007

IRO-006-3 as revised during 2/27-28 Meeting

NERC IDC Reference Document/Attachment 2 Revised 2/28/2007
February 27-28, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team

Birmingham, AL

Hosted by Southern

Held at the Birmingham Marriott

Web Conferencing provided by NAESB
Agenda Final Minutes

IRO-006 Attachment 1 General Update NERC/NAESB split revised 2/27-28/2007

IRO-006-3 as revised during 2/27-28 Meeting

NERC IDC Reference Document/Attachment 2 Revised 2/28/2007
Nearby Hotels - Birmingham, AL

Mapping of Separation of Reliability Policies and Business Practice Standards 2/22/07

IRO-006-3 (version of IRO006-3 the committee plans to use in the mapping process)

NERC IRO-006-2

NERC General Update with NAESB SAR IRO-006 Attachment 1

R04013A Final Action - Recommendation for Development of post-split "Version 0" Transmission Loading Relief (TLR) Business Practice Standard - Ratified April 10, 2006

R04013A Final Action - Attachment

R06002 Final Action - Recommendation - Modify NAESB per split "Version 0" TLR Business Practices to remain consistent with NERC IRO-006-1 pre split TLR Reliability Standards (inclusion of market flows) - Ratified Septemer 1, 2006

R06002 Final Action - Attachment

Draft Minutes 1/10/07 - 1/11/07

Exhibit A - IRO-006 General Update NERC/NAESB split 1/12/07

NAESB TLR Business Practice Review

IDC Reference Documentation Submitted by L.Kezele, NERC

Market Flow Field Trial Monitoring Procedure - 2/15/07
January 10-11, 2007 Joint NAESB WEQ BPS and NERC TLR Drafting Team
Houston, TX

Hosted by NERC and held at the Hyatt Regency Hotel

Web Conferencing provided by NERC
Agenda Final Minutes  
January 3, 2007 WEQ BPS
Conference Call

With Web Conferencing
Agenda Final Minutes Updated TLR Matrix

TLR Team letter to NERC and NAESB
August 21, 2006 WEQ BPS
Conference Call

With Web Conferencing
Agenda Final Minutes Request R06010
August 11, 2006 WEQ BPS
Conference Call

With Web Conferencing
Agenda Final Minutes WEQ Annual Plan Item 3(c)(i) Revised Recommendation

Comments Submitted by Basin Electric Power Cooperative

Comments Submitted by JT Wood, Southern Company

Request R06010
June 26, 2006 WEQ BPS
Conference Call

With Web Conferencing
Agenda Final Minutes

Revised SOC Recommendation as of 6/26/06

Recommendation as of 6/16/06

Standards of Conduct Redlined Recommendation by K. York, Submitted 6/26/06
June 16, 2006 WEQ BPS
Conference Call

With Web Conferencing
Agenda Final Minutes

Attachment
Recommendation as of 6/16/06
Explanation of EC remand of Standards of Conduct

Link to Presentation Submitted by N. Saini
April 25, 2006 WEQ BPS

Conference Call

with Web Conferencing
Agenda Final Minutes

Redlined Recommendation for WEQ 2006 AP Item 3(c)(i)
WEQ 2006 Annual Plan Item (3)(c)(i)

Recommendation

Request for Comments due April 26, 2006

Comments Submitted by NAESB WEQ ESS/ITS

Comments Submitted by N.Saini, Entergy

R05007

Recommendation

Request for Comments due April 23, 2006

R06002

Recommendation

Post Split TLR Business Practice Standard with SPP Regional Differences

Request for Comments due April 13, 2006

Comments Submitted by J.Cyrulewski, ITC Transmission
March 23-24, 2006 WEQ BPS Meeting

Houston, TX

Held a the NAESB Office, Suite 2350

With Web Conferencing
Agenda

WEQ BPS Meeting

Agenda Items Completed
on March 23

Meeting CANCELED
for March 24
Final Minutes

Draft Recommendation WEQ 2006 AP (3)(c)

Draft Recommendation form for WEQ 2006 AP (3)(c) with Clean Standard Attached
Nearby Hotels

Draft Recommendation for WEQ 2006 AP Item (3)(c)

Comments Submitted by R. Martin, Southern Company Services

Comments Submitted by B. Kedrowski, We Energies

Comments Submitted by S.Henry, Duke Energy

Comments Submitted by E.Davis, Entergy

Comments Submitted by B.Rehman, BPA
March 10, 2006 Request for Comments
Due
March 21, 2006
    Notification of Request for Comments

Draft Recommendation for WEQ 2006 AP Item (3)(c)

Comments Submitted by R. Martin, Southern Company Services

Comments Submitted by B. Kedrowski, We Energies

Comments Submitted by S.Henry, Duke Energy

Comments Submitted by E.Davis, Entergy

Comments Submitted by B.Rehman, BPA
March 10, 2006 WEQ BPS

Conference Call

With Web Conferencing
Agenda Final Minutes

Attachment - Draft Recommendation for Standards of Conduct 3/10/06

BPS Responses to Informal Comments on R05007

BPS Responses to Informal Comments on WEQ AP Item (3)(c)

BPS Responses to Informal Comments on R06002
For R05007

Notification of Requests for Comments

Inadvertent Interchange Payback - Redline 2/22/06

Manual Time Error - Redline 2/22/06

Entergy Comments on R05007 Submitted by E.Davis

California ISO Comments on R05007 Submitted by D.Hawkins

For R06002

Notification of Request for Comments

Draft Recommendation R06002 Redlined

Comments Submitted by E.Davis, Entergy

For Standards of Conduct

Draft Recommendation on WEQ Standards of Conduct 2/8/06

Instructional Memo to ESS/ITS on Draft Recommendation for Standards of Conduct

Comments from N. Saini on Standards of Conduct

Entergy Proposal on Order 2004 Standards of Conduct

Comments Submitted by Southern
March 6, 2006 Request for Comments
Due
March 9, 2006
    Notification of Request for Comments

Draft Recommendation R06002 Redlined

Comments Submitted by E. Davis, Entergy
March 3, 2006 WEQ BPS

Conference Call

With Web Conferencing
Agenda Final Minutes

Attachment - Draft Recommendation R06002 as redlined during the 03/03/06 meeting
Changes to TLR Business Practices (Recommendation R04013A) by the BPS 11/22/05

Transmission Loading Relief (Eastern Interconnection Standards) (WEQ-008)

R06002

R06002 - Attachment

NERC TLR SPP Regional Difference Redline
February 23, 2006 Request for Comments
Due
March 9, 2006
    Notification of Request for Comments

Inadvertent Interchange Payback - Redline 2/22/06

Manual Time Error - Redline 2/22/06

Entergy Comments on R05007 Submitted by E. Davis

California ISO Comments on R05007 Submitted by D. Hawkins
February 22, 2006 WEQ BPS Meeting

Houston, TX

Held a the NAESB Office, Suite 2350

With Web Conferencing
Agenda Final Minutes

Inadvertent Interchange Payback - Redline 2/22/06

Manual Time Error - Redline 2/22/06
Nearby Hotels

Coordinate Interchange Standards (WEQ-004)

Area Control Error (ACE) Equation Special Cases Standards (WEQ-005)

Manual Time Error Correction Standards (WEQ-006)

Inadvertent Interchange Payback Standards (WEQ-007)

Transmission Loading Relief (Eastern Interconnection Standards) (WEQ-008)

R05007

R06002

R06002 - Attachment

CIBP as of 2/17/06

Link to Presentation Submitted by N. Saini
February 7-8, 2006 WEQ BPS Meeting

Houston, TX

Held a the NAESB Office, Suite 2350

With Web Conferencing
Agenda Final Minutes

Instructional Memo to ESS/ITS on Draft Recommendation for Standards of Conduct

Draft Recommendation on WEQ Standards of Conduct 2/8/06
Nearby Hotels

R05007

R06002

Final Action for WGQ 2004 AP Item 2

WGQ Final Action on Affiliate Reporting
November 22, 2005 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Changes to TLR Business Practices (Recommendation R04013A) by the BPS

Response to General Comments

Response to American Transmission Comments

Response to Entergy Comments

Response to TVA Comments
Recommendation for R04013A

Post Split Version 0 TLR Business Practices Standards

Request for Comments
on R04013A due
November 18, 2005


Comments (R04013A- TLR) Submitted by: E. Davis, Entergy Services, Inc.

Comments by: J. Voeck, American Transmission Company

Comments by: C. Yeung, ISO RTO Councils Standards Review Committee

Comments by: O. Frazier, Duke Energy

Comments by: R. Carter, Southern Company Generation

Comments by: E. Senkowicz, Florida Reliability Coordinating Council

Comments by: K. Warren, NERC Operating Reliability Subscommittee

Attachment to NERC Comments

Comments by: K. York, Tennessee Valley Authority

Comments by: J. Busbin, Southern Company Transmission
October 26-27, 2005 WEQ BPS Meeting

Houston, TX

Held at the NAESB Office, Suite 2350

With Web Conferencing
CANCELLED    
October 19, 2005 WEQ BPS Conference Call

With Web Conferencing
CANCELLED    
October 17, 2005 WEQ BPS Conference Call

With Web Conferencing
CANCELLED    
October 12, 2005 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

TLR as Revised during Meeting on 10/12/05 and with Offline Changes made 10/13/05
Comments from L.Kezele on TLR

TLR Revised 10/6/05

PJM/MISO; Managing Congestion to Address Seams
October 4-5, 2005 WEQ BPS Meeting

Houston, TX

Held at the NAESB Office, Suite 2350

With Web Conferencing
Agenda Final Minutes

Attachment-Redlined Draft NAESB TLR Business Practice Standards as of 10/5/05

Attachment-Clean Draft NAESB TLR Business Practices Standards as of 10/5/05
Nearby Hotels

TLR with Offline Changes made 9/15/05
September 23, 2005 WEQ BPS Conference Call

With Web Conferencing
CANCELED   TLR with Offline Changes made 9/15/05
September 13-14, 2005 WEQ BPS Meeting

Houston, TX

Held at the NAESB Office, Suite 2350

With Web Conferencing
CANCELLED    
September 7, 2005 WEQ BPS Conference Call

With Web Conferencing
Agenda Final Minutes

Attachment-NAESB TLR Business Practices Clean Draft - 9/7/05

Attachment-NAESB TLR Business Practices Redlined Draft - 9/7/05
TVA Comments on TLR 8-19-05

NAESB TLR Business Practice Clean Draft 8/9-10/05

Proposed Language Addressing Pro Rata Basis

NERC Draft Changes to IRO-006 Attachment 1
August 9-10, 2005 WEQ BPS Meeting

Houston, TX

Held at the NAESB Office, Suite 2350

With Web Conferencing
Revised Agenda Final Minutes

Attachment-NAESB TLR Business Practices Redline Draft
8/9-10/05


Attachment-NAESB TLR Business Practices Clean Draft
8/9-10/05
Nearby Hotels

Email from Rodriquez,PJM
on Requirements 3.1


TLR Business Practices - Version with Accepted Changes from 7/20/05 and with Redline Revisins Made by K. York on 8/4/05

NAESB Progress Report on July 1 Comments to NOPR

2004 WGQ Annual Plan Item #2 FERC Order 2004 (Affiliate Order)

R04006C - OASIS 1A Enhancements - Redirects
July 20-21, 2005 WEQ BPS Meeting

Houston, TX

Held at the NAESB Office, Suite 2350

With Web Conferencing
Agenda

WEQ BPS Meeting

Agenda Items Completed
on July 20

Meeting CANCELED
for July 21
Final Minutes

Attachment-NAESB TLR Business Practices Redline Draft
7/20/05


Attachment-NAESB TLR Business Practices Clean Draft
7/20/05
Nearby Hotels

NAESB TLR Business Practices Clean Draft
6/29/05


TVA Questions and Comments on the Draft TLR Business Practices
June 29, 2005 WEQ BPS Meeting

Houston, TX
Held at the NAESB Office, Suite 2350

with Web Conferencing
Agenda Final Minutes

Attachment-NAESB TLR Business Practices Redline Draft
6/29/05


Attachment-NAESB TLR Business Practices Clean Draft
6/29/05
Nearby Hotels

TLR Matrix - 6/21/05

Request for Comments on Draft TLR Business Practices

TVA Questions and Comments on the Draft TLR Business Practices

Entergy Comments on the Draft TLR Business Practices, Submitted by E. Davis

IDC Reference Document 4/20/05
June 17, 2005 Request for Comments Due June 24, 2005     Request for Comments on Draft TLR Business Practices

TVA Questions and Comments on the Draft TLR Business Practices

Entergy Comments on the Draft TLR Business Practices, Submitted by E. Davis
June 14-15, 2005 WEQ BPS Meeting

Houston, TX

Held at the NAESB Office, Suite 2350

With Web Conferencing
Revised Agenda Final Minutes

Attachment-NAESB TLR Business Practices Redline Draft
6-15-05


Attachment-NAESB TLR Business Practices Clean Draft
6-15-05
Nearby Hotels

NAESB TLR Business Practices Revised Draft 3

Entergy Comments NERC/NAESB draft TLR Split

SPP Comments (noted in Pink) on NAESB TLR

Final Consensus Division of TLR for Version 0 Business Practices, June 1, 2005 (Clean)

Final Consensus Division of TLR for Version 0 Business Practices, June 1, 2005 (Redline)

Review of IRO-006 to NAESB TLR Business Practices by Ed Davis
June 2, 2005 WEQ BPS Meeting

Houston, TX

Held at the NAESB Office, Suite 2350

With Web Conferencing
CANCELED   Nearby Hotels
May 9, 2005 WEQ BPS

Conference call OR Meeting
CANCELLED    
April 5, 2005 WEQ BPS Meeting

Washington, DC

Hosted by Edison Electric Institute
CANCELLED   Nearby Hotels
February 11, 2005 WEQ BPS Update Conference Call

with Web Conferencing
Agenda Final Minutes Chart of Version 1 Modifications and Additions - Revised
January 25, 2005

PLEASE NOTE DATE CHANGE
Conference Call

with Web Conferencing
CANCELLED    
November 29, 2004 Conference Call

With Web Conferencing
Revised Agenda Final Minutes

Attachment-Letter to EC

Attachment-Doc Incorporating Comments

Attachment-Replacement Definitions
Response on (Coordinate Interchange) Comments Submitted by G. Nolan - Salt River Project

Response on (Coordinate Interchange) Comments Submitted by M. Pfeister - Salt River Project

Response on (Inadvertent Interchange) Comments Submitted by C. Monroe - NERC

Response on (ACE Special Cases) Comments Submitted by C. Monroe - NERC

Response on (Time Error) Comments Submitted by C. Monroe - NERC

Response on (Time Error) Comments Submitted by G. Nolan - Salt River Project

Response on (Inadvertent Interchange) Comments Submitted by G. Brown - CASIO

Response on (Coordinate Interchange) Comments Submitted by G. Brown - CASIO

Response on (ACE Special Cases) Comments Submitted by G. Brown - CASIO

Response on (Time Error) Comments Submitted by G. Brown - CASIO

Response on (Time Error) Comments Submitted by A. Johnson - Mirant

Document Incorporating All Final Industry Comments on Version 0 and Responses to these Final Comments by the WEQ BPS - Updated 11/29/04, 9:00am

Overall comments submitted by O. Frazier - Duke Energy

Response on (Ace Special Case) Comments Submitted by A. Johnson - Mirant

Response on (Coordinate Interchange) Comments Submitted by W. Smith - Allegheny

Response on (Time Error) Comments Submitted by W. Smith - Allegheny

Response on (Overall) Comments Submitted by O. Frazier - Duke Energy

Proposed Replacement Definitions

NERC Glossary of Terms Used in Reliability Standards

Response on (Time Error) Comments Submitted by E. Davis - Entergy

Response on (Coordinate Interchange) Comments Submitted by E. Davis - Entergy

Response on (Inadvertent Interchange) Comments Submitted by E. Davis - Entergy

Response on (Ace Special Cases) Comments Submitted by E. Davis - Entergy

Response on (TLR) Comments Submitted by E. Davis - Entergy

Response on (Inadvertent Interchange) Comments Submitted by A. Johnson - Mirant

Response on (Coordinate Interchange) Comments Submitted by A. Johnson - Mirant

Response on (Time Error) Comments Submitted by K. Tammar - ISO RTO Council - SRC

Response on (Coordinate Interchange) Comments Submitted by K. Tammar - ISO RTO Council - SRC

Response on (Inadvertent Interchange) Comments Submitted by K. Tammar - ISO RTO Council - SRC

Response on (Ace Special Cases) Comments Submitted by K. Tammar - ISO RTO Council - SRC

Draft Cover Letter to the EC

Email Comment from NERC on TLR 11/29/04
October 22, 2004 Conference Call

With Web Conferencing
Agenda Final Minutes Timeline and Goals - updated 10/19/04

Draft Cover Letter

ACE Draft 2 Revised 10/19/04

Inadvertent Interchange Draft 2 Revised 10/19/04

TLR Draft 2 Revised 10/19/04

CI Version 0 Draft 2 Revised 10/19/04

Time Error Draft 2 Revised 10/19/04

ACE Special Cases Draft 3 Comment Form

Coordinate Interchange Draft 3 Comment Form

Inadvertent Interchange Draft 3 Comment Form

Time Error Draft 3 Comment Form

TLR Draft 3 Comment Form
October 12-13, 2004 Washington, DC

Hosted by the FERC,
Room 3M-4
Agenda Final Minutes

ACE Draft 2 Revised 10/19/04

Inadvertent Interchange Draft 2 Revised 10/19/04

TLR Draft 2 Revised 10/19/04

CI Version 0 Draft 2 Revised 10/19/04

Time Error Draft 2 Revised 10/19/04

Correspondence with NERC re: Version 0 Development
Timeline and Goals

Nearby Hotels
September 3, 2004 Request for Comments Due October 4, 2004     Request for Comments

ACE Special Cases Version 0, Draft 2 Comment Form

Coordinate Interchange Version 0, Draft 2 Comment Form

Inadvertent Interchange Version 0, Draft 2 Comment Form

Time Error Version 0, Draft 2 Comment Form

TLR Version 0, Draft 2 Comment Form

Comments Submitted by Hydro-Quebec TransEnergie on ACE Special Cases Version 0, Draft 2

Comments Submitted by Hydro-Quebec TransEnergie on Coordinate Interchange Version 0, Draft 2

Comments Submitted by Hydro-Quebec TransEnergie on Inadvertent Interchange Version 0, Draft 2

Comments Submitted by Hydro-Quebec TransEnergie on Time Error Version 0, Draft 2

Comments Submitted by Hydro-Quebec TransEnergie on TLR Version 0, Draft 2

Comments Submitted by Entergy Services, Inc. on ACE Special Cases Version 0, Draft 2

Comments Submitted by Entergy Services, Inc. on Coordinate Interchange Version 0, Draft 2

Comments Submitted by Entergy Services, Inc. on Inadvertent Interchange Version 0, Draft 2

Comments Submitted by Entergy Services, Inc. on Time Error Version 0, Draft 2

Comments Submitted by Entergy Services, Inc. on TLR Version 0, Draft 2

Comments Submitted by Salt River Project (Shirley McKean) on ACE Special Cases Version 0, Draft 2

Comments Submitted by Salt River Project (Gary Nolan) on ACE Special Cases Version 0, Draft 2

Comments Submitted by Salt River Project (Gary Nolan) on Coordinate Interchange Version 0, Draft 2

Comments Submitted by Salt River Project (Shirley McKean) on Coordinate Interchange Version 0, Draft 2

Comments Submitted by Salt River Project (Gary Nolan) on Inadvertent Interchange Version 0, Draft 2

Comments Submitted by Salt River Project (Shirley McKean) on Inadvertent Interchange Version 0, Draft 2

Comments Submitted by Salt River Project (Shirley McKean) on Time Error Version 0, Draft 2

Comments Submitted by Southwest Power Pool on Time Error Version 0, Draft 2

Comments Submitted by Southwest Power Pool on Coordinate Interchange Version 0, Draft 2

Comments Submitted by Cinergy Services on ACE Special Cases Version 0, Draft 2

Comments Submitted by Allegheny Power on TLR Version 0, Draft 2

Comments Submitted by NERC Resources Subcommittee on ACE Special Cases Version 0, Draft 2
September 2, 2004 Conference Call Agenda Final Minutes Time Error Standard, Draft 2, Redlined

Time Error Standard, Draft 2, Clean

CIBP Draft 2 - Revised 9/1/04

TLR Draft 2

ACE Special Cases V0D2 Comment Form - Revised 9/2/04

Coordinate Interchange V0D2 Comment Form - Revised 9/2/04

Inadvertent Interchange V0D2 Comment Form - Revised 9/2/04

Time Error V0D2 Comment Form - Revised 9/2/04

TLR V0D2 Comment Form - Revised 9/2/04

ACE Draft 2, 9/1/04 Revised

Inadvertent Interchange Draft 2, Revised 8/31/04

Draft 2 Posting Letter - Revised 9/2/04
August 31, 2004 Houston, TX

Held at the NAESB offices, 13th Floor, San Jacinto Room

With Web Conferencing during the afternoon portion of the meeting
Agenda Final Minutes Nearby Hotels

Timeline and Goals

Draft NAESB Version 0 CIBP,
Revised 8-26-04, Redline


Draft NAESB Version 0 CIBP,
Revised 8-26-04, Clean


Chart 2 Version 0 BPs-Decision, Accepted Comments, and Agreements 8-19-04

Time Error Correction Standard Version 0 Draft 2 Template

TLR Draft 2 (8-27-04) - Clean

TLR Draft 2 (8-27-04) - Redline

Draft 2 ACE Equation Special Cases BPS

Version 0 Inadvertent Interchange Draft 2, August 30, 2004

NAESB ATC Standard PBJ 8/30/04 Draft

NAESB CBM Standard PBJ 8/30/04 Draft

039 Reliability Coordination - Transmission Loading Relief
August 17-18, 2004 Houston, TX

Held at the NAESB offices, 23rd Floor
CANCELLED - RESCHEDULED FOR AUGUST 10-11, 2004    
August 17, 2004 Conference Call Agenda Final Minutes Timeline and Goals

Chart of Version 0 Updates from NERC-NAESB Version 0 Leadership Meeting on August 2-3, 2004 and WEQ BPS Meeting August 10-11, 2004

NERC-NAESB Collaborative Proposal for Version 0 Business Practice Standards
August 10-11, 2004 Houston, TX

Held at the NAESB offices, 23rd Floor

With Web Conferencing
Agenda Final Minutes Recommendation for R03017

Meeting Arrangements

Timeline and Goals

Summary of NERC-NAESB Joint TF to Recommend Assignment of Business Practices

Goals Chart of NERC/NAESB Version 0 Decisions from 8/2-3 Chicago Meeting

Summary of NERC/NAESB Joint TF to Recommend Assignment of BPs - Revised

Summary of NERC/NAESB Joint TF to Recommend Assignment of BPs - Revised 2
August 18-20, 2004

Please note date change
NERC Standards Drafting Team Meeting

Denver, CO

Held at the Marriott Denver City Center
8:00am - 5:00pm on day 1,

8:00am - 5:00pm on day 2

and 8am - Noon on day 3 (Mountain)
   
July 9, 2004 Request for Comments on Version 0 Business Practices Due August 9, 2004     Request for Comments due August 9, 2004

Comments Submitted by Kathy Davis, TVA Electrical Systems Operations

Comments Submitted by Hydro-Quebec TransEnergie's

Comments Submitted by TVA Bulk Power Trading, NAESB ACE Version Standard

Comments Submitted by TVA Bulk Power Trading, NAESB Emergency Operations Business Standard

Comments Submitted by TVA Bulk Power Trading, NAESB TLR Verion 0 Standard

Comments Submitted by TVA Bulk Power Trading, NAESB CIBP Verion 0 Standard

Comments Submitted by TVA Bulk Power Trading, NAESB Inadvertent Interchange Standard

Comments Submitted by TVA Bulk Power Trading, NAESB Time Error Correction Standard

Comments Submitted by Salt River Project, NAESB ACE Version Standard

Comments Submitted by Salt River Project, NAESB Emergency Operations Business Standard

Comments Submitted by Salt River Project, NAESB TLR Verion 0 Standard

Comments Submitted by Salt River Project, NAESB CIBP Verion 0 Standard

Comments Submitted by Salt River Project, NAESB Inadvertent Interchange Standard

Comments Submitted by Salt River Project, NAESB Time Error Correction Standard

Comments Submitted by Florida Reliability Coordinating Council, NAESB Version 0 Standards

Comments Submitted by WECC

Comments Submitted by Mirant

Comments Submitted by We Energies

Comments Submitted by National Grid

Comments Submitted by Entergy Services, Inc.

Comments Submitted by Progress Energy - Carolinas

Comments Submitted by the following TAPS Members - IMPA, FMPA, WPPI, VPPSA nad Lincoln Nebraska Electric System
July 7-8, 2004 Houston, TX

Held at NAESB office, 13th Floor, Fannin Room
Agenda Final Minutes Nearby Hotels

NAESB TLR Standard Version 0 Draft 1 - 6/29/04

NAESB TLR Standard Version 0 Supporting Documentation

NAESB Time Error Correction Draft 1 - 07/04 Clean

NAESB Time Error Correction Draft 1 - 07/04 Redline

Appendix 1A NAESB NKS Version 2 - Clean

Appendix 1A NAESB NKS Version 2 - Redline

NAESB Inadvertent Interchange Standard - Redline

NAESB Inadvertent Interchange Standard - Clean

NAESB Appendix 1A Redline Apdx1F BOT Approved-0203

NAESB Appendix 1A Clean Apdx1F BOT Approved-0203

Draft 1 Posting Letter

CIBP Standard Version 0 - 6/30/04

NAESB Version 0 Policy 3 Support Document

Version 0 Business Practices/NERC Operating Policy 5

Version 0 Business Practices/NERC Operating Policy 5/Clean
July 1-2, 2004 Chicago

Host TBD
CANCELLED - MOVED TO JULY 7-8    
June 29, 2004 Conference Call Agenda Final Minutes Version 0 Business Practices Assignments

Version 0 Business Practices/NERC Operating Policy 5

Version 0 Business Practices/NERC Operating Policy 5/Clean

Version 0 Business Practices/NERC Operating Policy 3 and Appendices

Version 0 Business Practices/NERC Appendix 1A

Version 0 Business Practices/NERC Operating Policy 1, Section F 4 & 5/Clean

Version 0 Business Practices/NERC Operating Policy 1, Section F 4 & 5/Redline

Version 0 Business Practices/NERC Operating Policy 1, Section F 4 & 5/Original Text

NAESB Version 0 Business Practices TLR Standard

Version 0 Business Practices Draft Time Error Correction Standard

Version 0 SDT June 28-30, 2004 Meeting - Operating Policy Markups and Operations Draft Version 0 Standards

Version 0 SDT June 28-30, 2004 Meeting - Draft Planning Standards
June 28-30, 2004 NERC Standards Drafting Team Meeting

Chicago, IL
All Day    
June 17-18, 2004 Columbus, OH

Hosted by AEP
Revised Agenda Final Revised Version 0 Action Plan

Final Minutes
(Word Format)


Meeting Arrangements

Updated Request for Standards Development and Timeline and Deliverable Dates for Preparing "Version 0" Business Practices

Disposition of Version 0 Business Practices Associated with NERC Version 0 Reliability Requirements

Appendix 9C1

Appendix 9C1B

Appendix 9C1C

Appendix 9C2

Appendix 9C3

CIBP Standard Version 0
6-11-04


Version 0 BPS Raw Text

Link to the NERC Functional Model

Summary of BPS Decisions on 6/2/04

Action Plan for Developing Version 0 Business Practices
June 2-3, 2004 Atlanta, GA

Hosted by Georgia Power
Agenda Final Minutes
(Word Format)


Version 0 Business
Practices Outline
(Word Format)


BPS Version 0 Proposals - Final 6/8/04
(Word Format)
Nearby Hotels

MC Business Practice Review 06/01/04
May 11, 2004 Houston, TX

Held at NAESB Office, 13th Floor, San Jacinto Room
Agenda Final Minutes
(Word Format)
Meeting Arrangements

Background information on Operating Policy Changes

Policy 5

Policy 6

Policy 9

Correspondence from NERC regarding Accelerated Transition to "Version 0" Reliability Standards

NERC Functional Model

Policy 3 Analysis

Policy 1

NERC Reliability Standards - Accelerated Transition to Version 0

Version 0 SAR

Proposed NAESB Request for Level 0 Standards Development

Update after the 5/11/04 Meeting including the Request and the Timetable

If you should encounter any problems or need further information, please call (713) 356-0060.
About NAESB | Contact NAESB | Email: naesb@naesb.org | Home Page

Copyright © 2009 North American Energy Standards Board, Inc. All rights Reserved.
This material may not be reproduced in any form without permission.